Operating Instructions Bracken Hill South West Industrial Estate Peterlee Co Durham SR8 2SW ENGLAND Tel: +44(0)
PrimeTest 300 Operating Instructions - 10 - DECLARATION OF CONFORMITY As the manufacturer of the apparatus listed, declare under our sole responsi
PrimeTest 300 Operating Instructions - 11 - Introduction The PrimeTest 300 is a hand held, battery powered, multifunction test instrument capable
PrimeTest 300 Operating Instructions - 12 - 1.0 User Notes These operating instructions are intended for the use of adequately trained personn
PrimeTest 300 Operating Instructions - 13 - 2.0 Safety Notes This PrimeTest 300 has been built and tested in accordance with: IEC 61010-1: 20
PrimeTest 300 Operating Instructions - 14 - - Do not operate the PrimeTest 300 in an explosive gas or dust environment. - Do not touch the bare
PrimeTest 300 Operating Instructions - 15 - 3.0 Accessories 3.1 Standard Accessories The PrimeTest 300 is supplied with the following item
PrimeTest 300 Operating Instructions - 16 - 4.0 Unit Description Refer to fig. 1 and fig. 2. The PrimeTest 300 is a hand held, multi function
PrimeTest 300 Operating Instructions - 17 - 5.0 Getting Started 5.1 Charging New Batteries Before using the PrimeTest 300 for the first time
PrimeTest 300 Operating Instructions - 18 - 5.4 Battery Health Check While the PrimeTest 300 is powered on there are periodic checks of the batter
PrimeTest 300 Operating Instructions - 19 - The Data Transfer functions are accessed by pressing Menu (F4), selecting Data Transfer using the ar
PrimeTest 300 Operating Instructions - 2 -
PrimeTest 300 Operating Instructions - 20 - The PrimeTest 300 is now ready to transfer data. No. of assets shows the number of records that will b
PrimeTest 300 Operating Instructions - 21 - 6.3 Send/Receive Config Data This feature can be used to transfer Site, Location, User and Comments
PrimeTest 300 Operating Instructions - 22 - Data is transferred to the PrimeTest 300 using the format shown below: [SiteName] London Leeds Newcast
PrimeTest 300 Operating Instructions - 23 - 6.3.2 Receive Config Data Follow the steps above in Send Config Data to run the Bluetooth Downloader a
PrimeTest 300 Operating Instructions - 24 - 7.1 Search The Search (F1) function is used to search through saved data. The search filter is sho
PrimeTest 300 Operating Instructions - 25 - This allows selected records to be printed onto labels, downloaded to PC or deleted from memory. Indiv
PrimeTest 300 Operating Instructions - 26 - 8.0 Memory Options Memory options is used to view information about the PrimeTest 300 memory status. P
PrimeTest 300 Operating Instructions - 27 - 9.0 Configuration The configuration facility is used to edit test sequences, set date and time, and co
PrimeTest 300 Operating Instructions - 28 - The PrimeTest 300 allows the user to Edit, Copy, Delete or Print an existing sequence or create a New
PrimeTest 300 Operating Instructions - 29 - 9.1.4 Creating a New Sequence A new test sequence can be created using this option. The default name f
PrimeTest 300 Operating Instructions - 3 - Figure 1 PrimeTest 300 Front View Figure 2 PrimeTest 300 End View
PrimeTest 300 Operating Instructions - 30 - Now scroll through the list of default tests until the required test is highlighted and press Select (F
PrimeTest 300 Operating Instructions - 31 - 9.1.5 User Tests The PrimeTest 300 has the unique ability to create user-defined tests. When using the
PrimeTest 300 Operating Instructions - 32 - The User Test Name will now be highlighted. For convenience a selection of commonly used names have be
PrimeTest 300 Operating Instructions - 33 - An example test sequence created to measure microwave leakage is shown below. When this test sequence
PrimeTest 300 Operating Instructions - 34 - 9.2 Set Date/Time The Primetest 300 is equipped with a real-time clock. To alter the date or time pre
PrimeTest 300 Operating Instructions - 35 - 10.0 User Options Each User has the option to customise aspects of the PrimeTest 300 in accordance wit
PrimeTest 300 Operating Instructions - 36 - 10.1.1 Asset ID This can be set to automatically increment the ID number at the end of each test, pre
PrimeTest 300 Operating Instructions - 37 - New Test will auto save at the end of a test sequence and then open the Asset Details window ready for
PrimeTest 300 Operating Instructions - 38 - Pressing New Test (F2) will proceed to the Asset Details window, ready for a new test. Pressing Option
PrimeTest 300 Operating Instructions - 39 - 10.2 Preferences There are a number of general features within the PrimeTest 300 that can be setup/
PrimeTest 300 Operating Instructions - 4 - Figure 3 Earth Continuity Measurement
PrimeTest 300 Operating Instructions - 40 - 10.2.3 Auto Off Time (mins) The PrimeTest 300 will power itself off after a period of inactivity. This
PrimeTest 300 Operating Instructions - 41 - highlight desired function and the left/right arrow keys to set. 10.3 Change User The PrimeTest 300 h
PrimeTest 300 Operating Instructions - 42 - Use the left/right arrow keys to change to an existing User Name or press New (F3) and type in a new n
PrimeTest 300 Operating Instructions - 43 - Note: Access for other Users is only restricted after a password has been set for the Admin User. If
PrimeTest 300 Operating Instructions - 44 - Enter the current password into the first field – if no password is set then leave this field blank.
PrimeTest 300 Operating Instructions - 45 - 11.0 Manual Test Functions Once in Manual mode the tester can perform one of seven tests as described
PrimeTest 300 Operating Instructions - 46 - part. Press the green START key to begin the test. The test will run for the duration set. To end the t
PrimeTest 300 Operating Instructions - 47 - 11.3 IEC Lead Refer to Fig. 5 IEC leads are tested in 3 stages, continuity, insulation and polarity.
PrimeTest 300 Operating Instructions - 48 - 11.4 Class II Leakage Current Refer to Fig 6 This test is applicable on Class II Equipment. The Class
PrimeTest 300 Operating Instructions - 49 - Neutral short exists or the EUT mains current consumption is too high. Internal Relay checks – Before
PrimeTest 300 Operating Instructions - 5 - Figure 5 IEC Lead Test Figure 6 Class II Leakage Measurement
PrimeTest 300 Operating Instructions - 50 - Press Setup (F3) to set the Test Duration and Pass/Fail limit. Use the arrow keys to highlight and set.
PrimeTest 300 Operating Instructions - 51 - While the PrimeTest 300 performs the test the LCD will show 0.0Ω flashing. When the test is complete t
PrimeTest 300 Operating Instructions - 52 - 12.0 Bluetooth Functions The PrimeTest 300 has built in Bluetooth connectivity. It is possible to co
PrimeTest 300 Operating Instructions - 53 - The Bluetooth Favourites list comprises of four sub-lists (device types), each of which can store up t
PrimeTest 300 Operating Instructions - 54 - Wait for the progress bar to complete. Use the arrow keys to highlight the field labelled “New” and
PrimeTest 300 Operating Instructions - 55 - Note: Some Bluetooth devices do not report a recognisable name and may cause confusion when setting u
PrimeTest 300 Operating Instructions - 56 - A PIN number can be entered if required by the device to be added to the Favourites list. Note: Seawa
PrimeTest 300 Operating Instructions - 57 - “My Laptop” is now a Bluetooth Favourite and the PrimeTest 300 will automatically establish a connectio
PrimeTest 300 Operating Instructions - 58 - 13.0 Automatic Test Mode The automatic mode allows the PrimeTest 300 to perform a predefined test
PrimeTest 300 Operating Instructions - 59 - for the barcode scanner in Bluetooth Favourites. Whilst searching, the Bluetooth status icon shows an
PrimeTest 300 Operating Instructions - 6 - Figure 7 Class I Leakage Current Measurement Figure 8 RCD and
PrimeTest 300 Operating Instructions - 60 - keypad. Simply enter the required ID in the Asset ID field as shown below. The function keys can be use
PrimeTest 300 Operating Instructions - 61 - PrimeTest 300 will automatically list any appropriate data currently in memory that begins with the cha
PrimeTest 300 Operating Instructions - 62 - The UP/DOWN can now be used to scroll through the Site list until the required Site is highlighted. Pr
PrimeTest 300 Operating Instructions - 63 - 13.2.2 Adding a new Site If the required Site is not already in memory, simply use the keypad to enter
PrimeTest 300 Operating Instructions - 64 - 13.3 Entering Location Information Move the cursor to the Location field. A Location can be selected i
PrimeTest 300 Operating Instructions - 65 - Select the desired Location from the list using the UP/DOWN arrows and press Select (F4) to confirm.
PrimeTest 300 Operating Instructions - 66 - The Edit keys can be used to correct the entry. When the required data has been entered, press the Ent
PrimeTest 300 Operating Instructions - 67 - Pressing the Left or Right arrows will open the list of available test sequences. Press the index le
PrimeTest 300 Operating Instructions - 68 - To enter a value, simply move the cursor to the correct field using the UP/DOWN arrows Now enter the r
PrimeTest 300 Operating Instructions - 69 - If the red STOP key is pressed during a test then the test is aborted and the abort menu appears as sh
PrimeTest 300 Operating Instructions - 7 - Limited Warranty & Limitation of Liability SEAWARD Electronic Limited guarantees this product to
PrimeTest 300 Operating Instructions - 70 - This sequence will now progress to the Earth Continuity test as shown. This test will measure the res
PrimeTest 300 Operating Instructions - 71 - The test will run until the countdown timer in the Duration field has reached zero. Note: During the
PrimeTest 300 Operating Instructions - 72 - Similarly, if the last reading is greater than the Limit, a Fail result is recorded. This is indicated
PrimeTest 300 Operating Instructions - 73 - The next test in this sequence is an insulation resistance test. The display is as shown below. Note
PrimeTest 300 Operating Instructions - 74 - The Class I icon is illuminated to indicate that the insulation resistance is measured between the live
PrimeTest 300 Operating Instructions - 75 - The next test in this sequence is a Protective Conductor Current measurement. The display now shows
PrimeTest 300 Operating Instructions - 76 - The Test Type field indicates whether the sequence was a visual inspection only or a full test where
PrimeTest 300 Operating Instructions - 77 - 13.7.1 View Results This will display the results for each test in the sequence as shown below. The
PrimeTest 300 Operating Instructions - 78 - 13.7.3 Print Label This allows Pass/Fail labels to be printed using the printer in the Bluetooth Favo
PrimeTest 300 Operating Instructions - 79 - Using Change Format (F1) to select a label format that displays a printed header will now display the t
PrimeTest 300 Operating Instructions - 8 - Table of Contents 1.0 User Notes…………………………….. 12 2.0 Safety Notes……………………………13 3.0 Accessories…………
PrimeTest 300 Operating Instructions - 80 - 14.0 Electrical Specifications 14.1 Earth Continuity Test Current (2Ω load) ±200 mA Test Circuit V
PrimeTest 300 Operating Instructions - 81 - 14.4 Class II Leakage Current Test Voltage Mains supply 230V +10% / -15% Max Load Current 1
PrimeTest 300 Operating Instructions - 82 - 14.7 RCD Trip Time Test Voltage Mains supply 230V +10% / -15% Test Current 30mA rms sinus
PrimeTest 300 Operating Instructions - 83 - 15.0 Environmental Conditions 15.1 The PrimeTest 300 has been designed to perform tests and measuremen
PrimeTest 300 Operating Instructions - 84 - 16.0 Maintenance Warning: Always ensure that the PrimeTest 300 is disconnected from all voltage sourc
PrimeTest 300 Operating Instructions - 85 - 16.3 Cleaning Clean the external case of the PrimeTest 300 with a clean dry cloth. Avoid using solve
PrimeTest 300 Operating Instructions - 86 - 16.5 Battery Replacement Over a period of time, (typically 1 to 2 years), the batteries will loose the
PrimeTest 300 Operating Instructions - 87 - and replaced where necessary. There are 3 fuses, one in the mains plug and 2 internal fuses. The mains
PrimeTest 300 Operating Instructions - 88 - fuse holder. Relocate the battery cover over the battery compartment and fasten in position with the b
PrimeTest 300 Operating Instructions - 89 - 16.8 Spare Parts. Seaward Part No Fuse 1¼ “ x ¼ “ 12.5A 250V Type T 27B111 Test Lead (with allig
PrimeTest 300 Operating Instructions - 9 - 10.2.2 Set Contrast…………………. 39 10.2.3 Auto Off Time……………….. 40 10.2.4 Data Entry……………………. 40 10.2.5 Back
PrimeTest 300 Operating Instructions - 90 - 17.0 Useful Information Parameter Default Min Max Earth Continuity P/F limit 1.00 0.01 5.0 Eart
Comentários a estes Manuais