Seaward PrimeTest 50 Instruções de Operação

Consulte online ou descarregue Instruções de Operação para Carregadores de pilhas/baterias Seaward PrimeTest 50. Seaward PrimeTest 50 Operating instructions Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 48
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
PRIMETEST 50
Operating Instructions
PRIMETEST
250
+
Operating Instructions
PRIMETEST
Vista de página 0
1 2 3 4 5 6 ... 47 48

Resumo do Conteúdo

Página 1 - PRIMETEST 50

PRIMETEST 50Operating InstructionsPRIMETEST250+Operating InstructionsPRIMETEST

Página 2

PrimeTest 250+Operating Instructions8Standard AccessoriesOptional AccessoriesPart Number403A91071G082305A950300A002396A972403A759403A556Seaward PrimeT

Página 3 - PRIMETEST

PrimeTest 250+Operating Instructions9Figure 1. PrimeTest 250+ Front View111210

Página 4

PrimeTest 250+Operating Instructions1014151613Figure 2. PrimeTest 250+ End ViewFigure 3. Testing CLI appliances, no mains leakage

Página 5

PrimeTest 250+Operating Instructions11Figure 4. Testing CLII appliances, no mains leakage

Página 6

PrimeTest 250+Operating Instructions12Figure 5. Testing CLI appliances, mains leakage

Página 7

PrimeTest 250+Operating Instructions13Figure 6. Testing CLII appliances, mains leakage

Página 8

PrimeTest 250+Operating Instructions14Figure 7. Testing IEC Leads

Página 9

PrimeTest 250+Operating Instructions15Figure 8. Testing Installation RCD

Página 10

PrimeTest 250+Operating Instructions16Figure 9. Testing Plug Top RCD

Página 11

PrimeTest 250+Operating Instructions172 IntroductionThe PrimeTest 250+ is a hand held battery powered unit suitable for carrying out electrical safety

Página 13 - Operating Instructions

PrimeTest 250+Operating Instructions18Power ON/OFF = press and hold CLI and CLII simultaneouslyClass I appliance test = press the CLI keyClass II appl

Página 14

3 Performing TestsPress CLI and CLII keys simultaneously to switch on the PrimeTest 250+. When the unit is ready the display will be as shown below.

Página 15

PrimeTest 250+Operating Instructions20After 2s the display will return to the start up screen.If the mains voltage is incorrect then the PrimeTest 250

Página 16 - Figure 7. Testing IEC Leads

• If the measured value is less than the factory set pass/fail threshold, the measured value is displayed and the unit indicates a pass result, as

Página 17

PrimeTest 250+Operating Instructions22• Check that the appliance power switch is in the ON position. The test will automatically proceed if the app

Página 18

• If a differential leakage test is performed then the test PrimeTest 250+ will prompt the user to start the Leakage test by fl ashing the Ileak

Página 19

PrimeTest 250+Operating Instructions24• If the Differential Leakage is less than the factory set limit a tick is placed next to the Ileak enunciato

Página 20

PrimeTest 250+Operating Instructions25Note: The power switch on the appliance under test must be in the ON position to perform an insulation te

Página 21

PrimeTest 250+Operating Instructions26• Check that the appliance power switch is in the ON position. The test will automatically proceed if the app

Página 22

• If a touch leakage test is performed then the PrimeTest 250+ will prompt the user to start the Leakage test by fl ashing the Ileak icon. If no k

Página 23

Part Number 403A556 Revision 2© 2014 Seaward Electronic LtdPrimeTest 250+Operating Instructions1Operating InstructionsPRIMETEST250+Bracken HillSouth

Página 24

PrimeTest 250+Operating Instructions283.4 Testing a mains cord• Visually inspect the mains cord and plug for signs of damage.• Check that the corr

Página 25

PrimeTest 250+Operating Instructions29Note: If the tested cord has a wiring fault, one of the following enunciators will be illuminated in place of GO

Página 26

PrimeTest 250+Operating Instructions303.6 Changing the Insulation Test VoltageThe Insulation test performed in the CLI and CLII test sequences can be

Página 27

3.8 Performing an RCD test on an installation RCD When performing an RCD test ensure that the Continuity Test probe is disconnected from the

Página 28

Whenever reSet is displayed on the LCD press the reset button on the RCD.The PrimeTest 250+ will perform a IΔn (30mA) 0° test, the operating time of

Página 29

PrimeTest 250+Operating Instructions33Mains statusNo mainsEarth faultLN LE NEFlash Flash OFFOFF Flash FlashWhenever reSet is displayed on the LCD pres

Página 30

PrimeTest 250+Operating Instructions34• Otherwise, the PrimeTest 250+ will proceed with the RPE measurement, reverse the test current and then repea

Página 31

PrimeTest 250+Operating Instructions354 Memory & Print FunctionsThe PrimeTest 250+ can store the results for a maximum of 999 appliances.4.1 Sav

Página 32

PrimeTest 250+Operating Instructions364.4 Transferring Test ResultsTest data can be transferred to a PC using the Datalogger on the provided PT250+ S

Página 33

PrimeTest 250+Operating Instructions374.6 Setting the Real Time ClockSetting time and date: Ensure that the PrimeTest 250+ is powered off. Press and

Página 34

PrimeTest 250+Operating Instructions2Limited Warranty & Limitation of LiabilitySEAWARD Electronic Limited guarantees this product to be free from

Página 35

PrimeTest 250+Operating Instructions385 Specifi cationEarth Continuity Display Range 0.01ohms to 19.99ohms Measuring Range 0.05ohms to 19.99ohms A

Página 36

PrimeTest 250+Operating Instructions39EarthContinuityInsulation ResistanceLeakageClass IClass IICord3-Phase0.2 ohmsn/a0.2 ohms0.2 ohms1.0Mohm2.0Mohm1.

Página 37

PrimeTest 250+Operating Instructions406 MaintenanceClean only with a dry cloth; do not use solvents.Before use, ensure unit is clean and dry; visually

Página 38

PrimeTest 250+Operating Instructions417.1 Battery Replacement Before opening the PrimeTest 250+ ensure that all test leads are disconnected. • S

Página 39

PrimeTest 250+Operating Instructions42Part Number27B114Replacement F16A 250V Fuse 8 Fuse Replacement Before opening the PrimeTest 250+ ensure th

Página 40

PrimeTest 250+Operating Instructions439 Service and CalibrationTo maintain the specifi ed accuracy of the measurement results, the instrument must be

Página 41

PrimeTest 250+Operating Instructions44

Página 43

PRIMETEST 50Operating InstructionsPRIMETEST250+Operating InstructionsPRIMETEST

Página 44

PrimeTest 250+Operating Instructions3Disposal of old productThis product has been designed and manufactured with high quality materials and components

Página 45

DECLARATION OF CONFORMITYAs the manufacturer of the apparatus listed, declare under our sole responsibility that the product:SEAWARD PrimeTest 250+To

Página 46

PrimeTest 250+Operating Instructions5Contents1 Important Information ... 62 Introduction ...

Página 47

1 Important InformationThese operating instructions are intended for the use of adequately trained personnel.The following symbols are used in these o

Página 48

The PrimeTest 250+ may apply high voltage or mains power to the appliance under test. Do not touch conductive parts of the appliance while tests

Comentários a estes Manuais

Sem comentários